    Providing Consultancy Services for the Planning and Detailed Engineering for the component of Railway Crossing of the Conveyor System of the Coal Handling Plant of the Expansion Project of Units 3 & 4 of 2 x 250 MW of Sikka TPS.

    Bharat Heavy Electricals Limited is executing the expansion project of establishing units 3 & 4 consisting of 2 x 250 MW at Sikka TPS, District, Jamnagar, Gujarat State, for GSECL on turnkey basis.

    As a part of implementing the coal handling plant for the expansion project, Underground conveyor system between wagon tippler area to coal handling area has been contemplated. The conveyor alignment from the wagon tippler area to the coal handling area, crosses a number of existing Railway lines handling the movement of coal wagons meant for supply of coal to the existing units 1 & 2. It will not be possible to divert the existing in use for construction of new conveyor system which has to be taken below the existing Railway lines without causing any operation problems. Design Group suggested the method of box pushing for construction of underground coal conveyor tunnels below the existing rail lines.


    The above work was entrusted to M/s Multidesign Infraworks Private Ltd., Bangalore by M/s Bharath Heavy Electricals Limited.

    The design work of coal conveyor tunnel and transfer points entrusted by M/s  Multidesign Infraworks Private Ltd., Bangalore to M/s Design Group Project Consultants Private Limited, Bangalore are successfully completed by Design Group.