Review Report on the DPR for BelakawadiSmallHydel Scheme

    The Government of Karnataka, through KREDL has allotted the development of Belakawadi Small Hydel Scheme with an installed capacity of 1.5 MW, to M/s.SLS Power Industries Limited, Bangalore vide its order G.O No.EN 504 NCE 2006 of 17-03-2007. This scheme across Cauvery river on the left bank near the existing Sattegala Diversion weir has been acquired by M/s Bhoruka Power Corporation Ltd, Bangalore from M/s.SLS Power Industries Limited for implementation. M/s.Bhoruka Power Corporation Ltd., Bangalore has entered into a MoU with Government of Karnataka for development of the Project.  M/s.Tecsol Engineers Pvt. Ltd., Bangalore, has prepared the DPR for the Project, with a proposed installed capacity 4 MW (2 x 2 MW) and a projected 50% Dependable year Annual Energy Generation of 10.43 Million units.

    M/s.Bhoruka Power Corporation Ltd, Bangalore have entrusted to M/s.Design Group Project Consultants Pvt. Ltd., Bangalore, the assignment of Review of the DPR prepared and furnishing an opinion on the Project proposals and the technical and financial viability of the Project.