Beedalli MHP



    The Beedalli Mini Hydel Project is under construction across Kumaradhara River near Beedalli village in Pushpagiri hill range  in Somavarapet Taluk, Kodagu District, Karnataka.   Kumaradhara River Originates at an Elevation of 1540 m in the Pushpagiri Hill ranges of Western Ghat.   The construction is taken up by the Developer M/s Kodagu Hydel Projects Private Ltd., Bangalore. The Project site is around 23 km from Somavarapet.  M/s Design Group has taken up the detailed engineering of the project including the tender services.

    The Beedalli Mini Hydel Project is having an installed capacity of 3 MW  with two units of 1.5 MW each.


    The components of the projects are:

  • Diversion Weir
  • Intake Structure
  • Head Race Tunnel of length of 110 m
  • Power House
  • Tailrace Pool and Tailrace Channel
  • Switchyard
  • Power Evacuation from project site to Somavarapet 33 KV Sub-Station.